ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

AN EVALUATION OF CAMEL RATING SYSTEM AS A MEASURE OF BANK PERFORMANCE: A STUDY OF SELECTED BANKS

ABSTRACT

This project is meant to evaluate CAMEL Rating system as a measure of Bank

performance of seven (7) selected Banks over a period of time from 1994-1998.

The Banks chosen are first Bank of Nigeria Plc, Intercity Bank Plc, United Bank for

Africa Plc, Savannah Bank of Nigeria Plc, Lion Bank of Nigeria Plc, Bank of the North

Limited and Cooperative Bank Plc. The choice of the seven Commercial Banks with similar

Operations was to compare the performance of one against another for the period under

review.

The CAMEL Rating system actually showed the performance of the Banks over

period and comparism was made of the performance of the peer group within the Industry.

To a greater extent all the seven Banks performed very sound throughout the period under

consideration.

Finally, conclusion and recommendations have been drawn based on the discoveries

made in the study.

TABLE OF CONTENT

Title page- – – – – – – – – i

Approval page – – – – – – – -ii

Dedication – – – – – – – – -iii

Acknowledgement – – – – – – – -iv

Abstract – – – – – – – – – -v

Table of content – – – – – – – -vi

CHAPTER ONE

INTRODUCTION – – – – – – – -1

1.0 Background of the study – – – – -1

1.1 Statement of the problem – – – – -5

1.2 Purpose of the study – – – – – -6

1.3 Significance of the study – – – – -8

1.4 Research questions – – – – – -9

1.5 Scope of the study – – – – – – -10

CHAPTER TWO

LITERATURE REVIEW – – – – – – -11

CHAPTER THREE

Research methodology – – – – – – -39

Design of study – – – – – – – -40

CHAPTER FOUR

Presentation, analysis and interpretation of data – -48

CHAPTER FIVE

Summary of findings – – – – – – -60

Conclusion – – – – – – – – -61

Recommendations – – – – – – – -62

Suggestions for further research – – – – -64

References – – – – – – – – -65

Appendix I – – – – — – – – -68

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *