BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!
INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420
WHATSAPP US ON 08137701720
AN EVALUATION OF PRODUCTION PROCESSES AND CAPACITY UTILIZATION
ABSTRACT
This research work aims at critically evaluating the process of production and the extent to which the installed capacity of Nigerian breweries is utilized. The study traced the historical development of the company its range of product and the extent which its capacity is utilized.
In collecting data for the research, two sources of data collection were used. They are primary and secondary data sources. The primary data were got through personal outer view and observations. While secondary data were collected from Nigerian breweries Plc Enugu and other relevant materials and information centers.
From the analysis of the data collected, the following findings were made:
1. There is problem with the acquisition of spare parts because of the ` prohibitive price of foreign exchange.
2. Poor maintenance of frequent machine breakdown. Statistics are not kept on the performance of machine.
3. Inadequate of raw materials which is one of the factors to the full utilization of the installed capacity.
4. Power failure breakdown on the production process. Despite the installation of 15 – mega watts electric generating plant as a safeguard against intermittent power supply from national electric power authority (NEPA) the company still suffer from power supply problem.
Based on the above findings, the following recommendations were offered after analyzing.
1. The rate of breakdown of machineries will prevent the [purchase of out model. Recommendation of periodic maintenance of machine should be adopted to reduce incidence of breakdown.
2. There is high cost of certain items, like beer which makes the consumption low. It was recommended that the company should be dong an objective pricing if its goods so that it does not price itself out of the market.
3. There is not enough training and development of staffs for the proper handing of the facilities of production industries it was recommended that enough training and development of staff should be provided the company. It will enable them to shift emphasis on keeping track of manufacturing line cost to facilities of production.
TABLE OF CONTENT
Title page- – – – – – – – – i
Approval page – – – – – – – -ii
Dedication – – – – – – – – -iii
Acknowledgement – – – – – – – -iv
Abstract – – – – – – – – – -v
Table of content – – – – – – – -vi
CHAPTER ONE
INTRODUCTION – – – – – – – -1
1.0 Background of the study – – – – -1
1.1 Statement of the problem – – – – -5
1.2 Purpose of the study – – – – – -6
1.3 Significance of the study – – – – -8
1.4 Research questions – – – – – -9
1.5 Scope of the study – – – – – – -10
CHAPTER TWO
LITERATURE REVIEW – – – – – – -11
CHAPTER THREE
Research methodology – – – – – – -39
Design of study – – – – – – – -40
CHAPTER FOUR
Presentation, analysis and interpretation of data – -48
CHAPTER FIVE
Summary of findings – – – – – – -60
Conclusion – – – – – – – – -61
Recommendations – – – – – – – -62
Suggestions for further research – – – – -64
References – – – – – – – – -65
Appendix I – – – – — – – – -68
Questionnaire. – – – – – – – -69
HOW TO RECEIVE PROJECT MATERIAL(S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
(4) Teller Number
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420